What happens when tasks run late?
Run a supplied plan through seeded duration variations and see how often it meets the deadline under that chosen model.
simulate_planTry the real call 01 / UNDERSTAND THE METHOD
ILLUSTRATION · NOT A CALCULATIONSee what the tool does.
INTERACTIVE 3D / METHOD STUDYExplore the method in space.
A teaching illustration. Run the tool below to obtain a native calculation.Drag to inspect · arrow keys move the camera · no MCP call
KNOW WHAT THE RESULT MEANS
Useful evidence needs boundaries.
- Independent uniform variation is an explicit scenario assumption, not a forecast learned from operational data.
- Correlated delays or heavy-tailed durations can change the result substantially.
- A high simulated success rate does not guarantee delivery. This tool evaluates a plan; it does not optimize its selection.